“Pengendalian Progres Biaya dan Waktu dengan Metode Earned Value Analysis Proyek Gedung”. 2025. Journal of Research and Inovation in Civil Engineering as Applied Science (RIGID) 4 (2): 71-79. https://doi.org/10.58466/rigid.v4i2.1877.